Millard Composite Decks on a Deadline: How Our 3-Day Builds Work

Millard Composite Decks on a Deadline: How Our 3-Day Builds Work

Decks, Decks & More Decks official logo for Omaha deck builder

Millard Composite Decks on a Deadline: How Our 3-Day Builds Work

If you’ve ever dreamed of replacing your old deck but dreaded the long construction timeline, we’ve got good news.
At Decks, Decks & More Decks, we’ve streamlined our process so Millard homeowners can enjoy a fully built composite deck in as little as three days — without sacrificing quality, safety, or craftsmanship.

Here’s how we do it.

 


 

Step 1: Pre-Planning Makes Everything Faster

Every 3-day build starts long before our crew shows up.
Our design and operations team handles all the preparation in advance:

  • Measurements, permits, and drawings completed before materials arrive.

  • Material pre-ordering from top brands like Trex®, TimberTech®, Deckorators®, and Fiberon®.

  • Crew scheduling based on weather windows and project scope.

By the time your project date arrives, everything — from railings to fasteners — is ready to go.

 


 

Step 2: Efficient Composite Materials

Composite decks are ideal for fast installs because the boards are pre-finished, uniform, and maintenance-free.
There’s no sanding, staining, or waiting for weather-dependent finishes to dry.

Our Millard clients love these low-maintenance brands for quick builds:

  • Trex Transcend®: Deep woodgrains, available in stock locally.

  • TimberTech Azek®: Lightweight PVC boards perfect for elevated decks.

  • Deckorators Voyage®: Excellent traction and heat resistance.

Composite deck installed with professional craftsmanship and low-maintenance design.


 

Step 3: Specialized Crews, Not General Contractors

We don’t outsource our work or mix in subcontractors.
Each 3-day project is handled by our dedicated deck installation team — builders who specialize only in decks, not general construction.

That’s why we can confidently deliver a full composite deck with railings, stairs, and trim in three days or less (weather permitting).

 


 

Step 4: Safe Speed — Not Corners Cut

Speed only matters if the deck lasts.
Our process is built around efficiency, not shortcuts.

  • Every footing and joist is built to Nebraska building code standards.

  • We use hidden fastener systems for precision and clean lines.

  • The entire frame is inspected for level, spacing, and structural integrity before any boards go down.

Even with our rapid turnaround, your deck gets the same attention to detail as our largest custom projects.

 


 

Step 5: The 3-Day Build Timeline

Here’s what the process typically looks like for Millard homeowners:

Day Process
Day 1: Tear-down of old deck (if needed) and frame construction
Day 2: Decking, fascia, and railing installation
Day 3: Final inspection, cleanup, and walk-through

After that, your family can start enjoying your new deck immediately — no waiting for stain or sealant.

 


 

Real Results in Millard

We recently completed a 12’x16’ TimberTech deck near 168th & Q in just under three days.
The homeowner went from rotted cedar boards to a sleek, low-maintenance composite design with aluminum railings — all before the weekend barbecue.

That’s the kind of transformation we love delivering.

 


 

Why Millard Homeowners Love 3-Day Deck Builds

✅ Minimal disruption to your schedule
✅ No prolonged noise or debris
✅ Fixed, transparent pricing
✅ Proven craftsmanship with long warranties

We’ve built hundreds of decks across Millard, West Omaha, and Chalco, and every project follows the same streamlined method — built fast, built right, built to last.

 


 

Ready to Start Your Fast Deck Build?

Whether you’re upgrading to composite or replacing an aging wood deck, we can help you go from idea to installation in record time.

Call (402) 690-1050 or visit our Papillion showroom to plan your 3-day composite deck build in Millard today.